
Service
Tiling
Wall and floor tiling with set-out planned so cuts land where they should - or not at all.
How we approach it
Set-out before adhesive
We dry-lay and mark up so grout lines run through, niches centre, and awkward cuts hide where nobody looks.
Substrate discipline
Flat, dry, correctly primed substrates. Falls checked with water, not assumed.
Clean edges
Mitres, trims and silicone lines finished to the same standard as the tiles themselves.
- Substrate preparation and priming
- Screeding and falls to waste
- Wall, floor and outdoor tiling
- Large-format and stone handling
- Mitred edges and trim detailing
- Grouting, sealing and silicone finishing
Questions
Good to know
- Do you tile outdoor areas?
- Yes - terraces, outdoor bathrooms and entries, with appropriate falls, membranes and slip ratings.
- Can you tile over existing tiles?
- Sometimes, if the existing bed is sound and the height works. We assess on site.
- Do you supply tiles?
- You can supply your own or we will quote an allowance and help you choose.
- How soon can a tiled area be used?
- Generally 24 to 72 hours after grouting, depending on product and conditions.
Also from the studio
